Install the rough plumbing.
Cap the water supplies and check for leaks.
Install the drain to the bath following the drain manufacturer’s instructions.
Place a clean drop cloth in the bath basin to protect the surface during installation.
2. Install the Tiling-In Bead (Optional)
NOTICE: A tiling-in bead should be installed if the nished wall material will come
into contact with any top surface of the bath. The tiling-in bead prevents water from
seeping behind the wall.
NOTICE: The boom edge of the tiling-in bead may need to be trimmed for proper
t in the installation location.
Thoroughly clean the bath rim.
Install the tiling-in bead following the manufacturer’s instructions.
1420039-2-A
6 Kohler Co.