One fitter / two fitters working
The table below indicates in which phases of the installation two fitters are required and when
the installation can be undertaking by a single fitter.
This is indicated using symbols in the beginning of the chapters.
= One fitter working
= Two fitters working
Installation phases one / two fitter(s)
1 Receipt and control of material (two fitters for transportation of
new material)
2 Preparations OR
3 Installing travelling cables
4 Dismantling old machine room equipment
5 Installing and wiring of machine room equipment
6 Start-up
7 Installing top service limit ramp
8 Installing shaft lighting
9 Removing old elevator shaft equipment
10 Installing hanging wires
11 Installing shaft bundle and positioning magnets
12 Connecting landing door locks and buttons
13 Removing old shaft bundle
14 Installing and wiring of car equipment
15 Installing floor level flags
16 Full speed adjustment / commissioning
17 Removing old equipment