SITE REQUIREMENTS AND TOOLS
Site requirements
Familiarise yourself with the data that is collected earlier from this elevator site. Read the
order form for the positions and critical dimensions of the elevator (machine room, car roof
and elevator shaft equipment).
In addition to the normal survey made when the quotation is prepared a site safety audit is
essential before any work can commence.
• Machine room and car roof layout documents must be available.
• Transportation of equipment to the machine room must be planned. Transportation routes,
transportation loadings and lifting point loadings must be planned.
• Suitable secure material storage areas must be agreed with building owner, adjacent to
the elevator shaft.
• Clear and unobstructed access routes must be defined.
• Suitable provision for disposal of waste materials must be available, according to local
requirements.
• Adequate lighting, temporary or permanent, must be installed.
• Lifting points must be correctly positioned in the machine room and marked with the safe
working loads.
• All building work must be planned and agreed with the building owner.
• All required electrical work, for example new main supply, must be done.
• Installation of shaft light can be done first if the elevator has a car inspection box.
Ensure that the car and counterweight are balanced to 50%.