Do you have a question about the Laars newport NP 85 and is the answer not in the manual?
Recommends National Fire Protection Standard for Oil Burning Equipment (NFPA 31).
Inspect boiler upon arrival for damage and file claims with the carrier.
Position boiler near chimney with minimum smoke pipe connector length of 18".
Specifies minimum clearances: Top 6", Front 24", Rear 6", Sides 6".
Boiler must be mounted on a noncombustible masonry or cement floor.
Requires inlet/outlet openings for adequate air supply for combustion.
Connect to a chimney with sufficient draft and install a draft regulator.
Assemble jacket panels if not pre-fitted according to Figure 4.
Fit burner tube into boiler and secure flange per instructions.
Fit controls like circulator, tridicator, relief valve, and aquastat relay.
Use only No. 2 heating oil; do not use gasoline or contaminated oil.
Consult local codes for fuel storage and use recommended fuel line materials.
All wiring must comply with National Electrical Code, NFPA 70, and local codes.
Explains how the Honeywell L8124A aquastat relay controls the burner and circulator.
Connect anti-scald tempering valve and pressure relief valve for domestic hot water.
Recommends annual cleaning for efficiency and longevity, especially at the end of the season.
Sweep chimney annually and inspect for blockages or nests.
Burner servicing must be performed by trained and licensed technicians.
Coil may restrict due to mineral deposits; acid treatment or replacement may be needed.
Step-by-step instructions for removing the coil for cleaning or replacement.












Loading...