EasyManua.ls Logo

laguna MDCCF32201 - Page 30

laguna MDCCF32201
52 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3HP Mobile Dust Cyclone Manual
29
Step Thirty: Lift the foot peddle bar. Align the Octagon drum window to the center
point of the drum lid and push the drum in. Lower the foot peddle bar (s) to
seal the drum tight for normal machine operation.
Step Thirty One: Make sure when aligning the drum that both the left and right
side lift plates are over the topping on the foot peddle bar assembly before lifting
the foot peddle bar up. When not aligned, the drum will not be fully sealed and
will interfere with the air flow.
1
2
3

Related product manuals