22
4.2 Levelling of the machine
a) Check levelling and alignment before final tightening.
b) At the end of assembly operations of all the modules, check to make sure that final
assembly corresponds to the connection drawing of the machine provided by the
manufacturer.
c) Assemble all of the other devices present: shelves, sliding guides,
any possible washing arms as shown in the photographs attached to
the file of machine assembly.