LAUNCH                                KES-200                   Charging System Analysis 
F-2 
4
5
2
3
1
7
6
 Fig.5-03 
 
1-KES-200 main unit 
2-engine analysis cartridge       
3-battery cable    
4-battery 
5-current wire of starter       
6-large current adapter    
7-main cable 
 
 
Fig.5-04 
 
While testing, user may: 
z  Press [0] to save the tested waveform or replay 
the saved waveform;   
z  Press [1] to adjust the time division;   
z  Press [2] to adjust the current division;   
z  Press [4] to adjust the position of zero line to get 
a better analysis of waveform;