Keor MOD
Installation and maintenance manual
73
During the hot-swap procedure the maximum active power available is indicated in the following table:
MAXIMUM ACTIVE POWER AVAILABLE
KEOR MOD 50 25 kW (50%)
KEOR MOD 75 50 kW (66%)
KEOR MOD 100 75 kW (75%)
KEOR MOD 125 100 kW (80%)
KEOR MOD 150 125 kW (84%)
KEOR MOD 175 150 kW (86%)
KEOR MOD 200 175 kW (88,5%)
KEOR MOD 225 200 kW (89%)
KEOR MOD 250 225 kW (90%)
The following is the how-swap procedure:
1. Check that the load connected to the UPS allows the power module replacement without causing an overload.
2. On the main screen, tap on the UPS which has the PM to replace.