EasyManua.ls Logo

LEGRAND Keor MOD Series - Battery Drawers Installation

LEGRAND Keor MOD Series
100 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
60
4.4 Battery drawers installation
The cabinet for Keor MOD 125 may include two to ten internal battery drawers. Each battery string is made up of two
drawers, therefore it is necessary to install them two by two.
The battery drawers have a specific order in the cabinet that must be kept, especially if the UPS has to work in a configu-
ration with indipendent strings of batteries.
During the installation it is necessary to use the appropriate Personal Protective Equipment (see paragraph 2.3).
4. Installation

Table of Contents

Other manuals for LEGRAND Keor MOD Series

Related product manuals