29
1. UPS measurements can be checked after UPS has started by pressing select
key. The display sequences are as below:
figure-F (AC input voltage)
figure-G (AC input frequency)
figure-H (UPS output voltage)
figure-I (UPS output frequency)
figure-J (UPS loading percentage)
figure-K (UPS output current)
figure-L (Battery voltage)
figure-M (UPS inner temperature) and back to figure-F.
F
G
H
I