EasyManua.ls Logo

Lennox CBX40UHV Series - Page 56

Lennox CBX40UHV Series
57 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 56
CBX40UHV
G−ECB40−8, 10 AND ECB40-15CB − 208/230V THREE PHASE − SEQUENCE OF OPERATION
FIRST−STAGE HEAT
1. W1 of the thermostat provides a W1 demand to the AHC. The AHC outputs a 22VDC signal to the K32 relay. K32−1 closes.
2. Assuming the N.C. primary (S15) and secondary (S20) limit switches are closed, electric heat element HE1 is energized.
SECOND−STAGE HEAT (remove jumper between W2 and R)
3. When K32-1 closes, the unit is ready for a second stage heat demand. W2 of the thermostat provides a W2 demand
to the AHC. The AHC outputs a 22VDC signal to the K33 and K34 relays.
4. When K33-1 and K34−1 close, assuming the N.C. primary (S15) and secondary (S20) limit switches are closed,
electric heat elements HE2 and HE3 are energized.
1
3
4
3
4
2
1

Other manuals for Lennox CBX40UHV Series

Related product manuals