EasyManua.ls Logo

Lennox ELITE 10 CB29M Series - Page 41

Lennox ELITE 10 CB29M Series
44 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 41
1
2
3
H–ECB29-5, -8, -10, -15CB – 208/230V THREE PHASE – SEQUENCE OF OPERATION
1- When there is a call for heat, W1 of the thermostat
energizes the electric heat relays K32 and K33
with 24VAC.
2- When K32-1 and/or K33-1 closes, the blower is ener-
gized on heating speed and economizer heat relay
K43 is energized (see 208/230VAC CB schematic).
3- When K32-1, K32-2, and K33-2 closes, assuming the
N.C. primary (S15) and secondary (S20) limit
switches are closed, electric heat elements HE1,
HE2, and HE3 are energized.

Table of Contents

Related product manuals