Electrical installaon
Important notes
•
When working on energized products, comply with the applicable naonal accident prevenon
regulaons.
•
The electrical installaon must be carried out according to the appropriate regulaons (e.g. cable cross‐
secons, fuses, PE connecon).
•
The manufacturer of the system or machine is responsible for adherence to the limits required in
connecon with EMC legislaon.
Preparaon
In the case of motors with terminal boxes, the notes for the electrical connecon can be found
inside the terminal box.
In the case of motors with connectors, the notes for the electrical connecon can be found on the
enclosed connecon diagram.
For a detailed descripon of how to ensure EMC-compliant wiring, please refer to the project
planning documents for the Lenze inverters.
Motor connecon
Connecon via ICN connector
Posion of the connecons
Posion Meaning Posion Meaning
1 Connector, ICN-M23 6-pole
Connector, ICN-M40 8-pole
•
Power connecon
•
Brake connecon
•
PE connecon
3 Connector, ICN-M23 hybrid
•
Power connecon
•
Brake connecon
•
PE connecon
•
Terminal for digital absolute value encoder
•
Connecon of temperature monitoring
2 Connector ICN-M23
•
Feedback connecon
•
Connecon of temperature monitoring
Electrical installaon
Preparaon
46