EasyManua.ls Logo

Lenze m550-H-P63 80 Series - Ventilation

Lenze m550-H-P63 80 Series
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Venlaon
No venlaon measures are required for the gearboxes g500-B45 … B240.
The gearbox g500-B240 can oponally be ed with venlaon units.
From g500-B450 onwards, the gearboxes are supplied with venlaon units as
standard.
Gearboxes that are delivered with a venlaon unit are provided with a label.
Remove the transport locking device on the vent valve before inial commissioning.
Loosely enclosed vent valves must be mounted in accordance with the mounng posion.
g500-B240
Mounng posion M1 (A) Mounng posion M2 (D) Mounng posion M3 (B)
Filling and venlaon
+
+
+
Control
Drain
Mechanical installaon
Installaon
Venlaon
23

Related product manuals