EasyManua.ls Logo

Lenze m550-H-P63 80 Series - Page 31

Lenze m550-H-P63 80 Series
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounng the machine sha
1
1
2
1 Rotang cover
2 Clamping screws
1.
Check machine sha
-
Diameter in t tolerance h6
-
Material yield point Re ≥= 360 MPa
-
E-module approx. 210000 MPa
-
Surface roughness R
z
≤ 15 µm
-
Concentricity (to prevent unnecessary addional forces caused by tensioning)
2. Remove rotang cover (1) from the shrink disc
3.
Thoroughly clean and degrease hollow sha bore and machine sha.
4.
Slightly loosen clamping screws (2) one aer the other, do not unscrew.
5.
Push gearbox onto machine sha.
6.
Slightly ghten clamping screws manually.
7.
Tighten clamping screws (2) one aer the other (approx. 5) in several passes, with rising
torque, evenly unl the indicated screw-ghtening torque is reached at all screws.
8.
Pull the co-rotang cover (1) over the shrink disc.
Mechanical installaon
Mounng
31

Related product manuals