EasyManua.ls Logo

LG 55EG9600 - MAKING CONNECTIONS; HDMI or DVI to HDMI Connection Methods

LG 55EG9600
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LG
November 2017
55EG9600 (2015 OLED) Power Supply
TEST 2 Power Supply Board 12VT to T-CON Voltage Check
Continue if Test 1 was OK.
Leave original jumper (A) in place.
AC Power is removed at this time.
The T-CON should be connected, SMPS P202 and P203 to T-CON.
TEST 2: T-CON 12V POWER SECTION TEST:
(3) Add another jumper (B) between (STBY_3.5V) pin 8 and (12V_ON) Pin 18.
(See Fig. 2), Simulating PWR_ON and 12V_ON commands.
(4) Apply AC Power.
(5) Check 12V (11.87V) on pins 7-12 on P202.
T-CON 12V Normal:
a) If normal, the SMPS is OK, T-CON 12V load test OK.
T-CON 12V Abnormal:
a) Recheck all connections.
b) Confirm the 12V_ON line pulling up to at least 3V.
c) Check SMPS P203 pins 7-12 for an excessive load,
normal diode check should be;
0.47V P203 connected
“0.50V” P203 disconnected.
Also, check CN11 pins 8-12 on the T-CON for an excessive load.
1.89V (Blk on Gnd) Panel Connected or Disconnected.
0.42V (Red on Gnd) Panel Connected or Disconnected.
See Next page to Test the Power Supply’s T-CON 12VT and 24VD line.
SMPS TEST 2
Top Row pins
are Odd numbers
DRV_ON
TIP: If you are concerned that
you may accidently connect the
jumpers in the incorrect
locations, please use a 100 ohm
1/8W resistor instead.
Fig 2
17 18
15 16
13 14
11 12
9 10
7 8
5 6
3 4
1 2
P201
12V
12V
STBY 3.5V
24V
24V
PWR_ON
A
12V
12V_ON
B
23 24
21 22
19 20
STBY 3.5V
STBY 3.5V
12V
12V
24V
24V
Gnd
Pin 1 is Bottom on SMPS
Pin 1 is Top on Main
Page 05

Other manuals for LG 55EG9600

Related product manuals