Installation
Installation Manual 27
ENGLISH
n Possible direction for field piping
• The installation piping is connectable in four di-
rections.(refer to figure 1)
• When connecting in a downward direction,
knock out the knockout hole of the base pan.
(refer to figure2, figure3)
n
Preventing foreign objects from entering (Figure 4)
• Plug the pipe through-holes with putty or insula-
tion material(procured locally)to stop up all
gaps,as shown in the figure 3.
• Insects or small animals entering the outdoor unit
may cause a short circuit in the electrical box.
CAUTION
• You should not dame pipe/base during the
work of pipe knock out.
• Operate piping work removing burr after pipe
knock out.
• Align the center of the piping and sufficiently
tighten the flare nut by hand.
• Finally, tighten the flare nut with torque wrench
until the wrench clicks.
- When tightening the flare nut with torque
wrench, ensure the direction for tightening fol-
lows the arrow on the wrench.
h
When tighten the pipe, hold the haxagonal body.
mm inch N
.
m
Ø6.35 1/4 16±2
Ø9.52 3/8 38±4
Ø12.7 1/2 55±6
Ø15.88 5/8 75±7
Outside diameter Torque