6. Tub Sub Assembly
1) Top Frame
① Remove front 2 screws.
② Remove side 2 screws.
③ Lift up top frame.
2) Balance Weight
① Remove 2 screws.
② Lift up balance weight.
3) Overflow Guide (R/L)
① Remove 1 screw of right side.
② Remove 1 screw of left side.
4) Steam Nozzle (Steam models only)
① Remove side 4 screws.
② Push the steam nozzle.
③ Pull up the overflow guide.
④ Pull up the packing of right/left side.
⑤ Pull up the strip.