EasyManua.ls Logo

LG LV120HCV - Bundling and Cutting Line

LG LV120HCV
66 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
40
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
Bundling and Cutting Line
Bundling and Cutting Line
Piping and cabling must be insulated and bundled together correctly
for safety and usage. Follow proper methods and procedures as
outlined here and on the next pages to ensure installation and piping
are correctly installed.
Insulation material
1. Piping must be fully encased in insulation material: Overlap the
field installation piping insulation material and the indoor unit
piping insulation material.
2. Bind together the two pipes, using vinyl tape. Make sure there
are no gaps during the binding.
3. Be sure the cutting line is placed upward (see figure below).
4. Wrap the rear piping house section with narrow vinyl tape.
5. Continue to wrap the indoor unit pipe as connected to the outdoor
connection pipe.
Figure 47: Typical Drain Pan Installation.
Figure 48: Piping with Insulation Material.
Figure 49: Correct Cutting Line Placement Figure 50: Wrapping Connection Pipe to Indoor Unit’s Pipe.
Gas Pipe
Liquid Pipe
Cutting Line
Cutting Line
Correct Incorrect
Vinyl tape (narrow)
Connection pipe
Connecting cable
Vinyl tape (wide)
Wrap with vinyl tape
Indoor unit pipe
Pipe
Wrap with vinyl tape
Drain hose
Pipe
Vinyl tape(wide)
6. Using a wider vinyl tape, bundle the piping and drain hose
together.
Tape must be sufficient to cover the piping in order to fit into the
rear piping housing area at the back of the indoor unit.
Always include plenty of insulation on all refrigerant and drain piping to
ensure condensate does not form and cause damage to walls, oors, etc.
Vertical Upflow
Horizontal Left
Field supplied
drain pan
Drain piping
Field supplied
drain pan
Drain piping
Indoor Unit Drain Pan
1. Install a drain pan if required by local code.
2. Figure 47 shows typical drain pan installation.
Checking the Indoor Unit Drain Hose for Leaks
1. Pour a glass of water on the evaporator.
2. Verify that the water flows appropriately through and out of the
drain hose of the indoor unit without any leaks.
Figure 51: Bundling Pipe and Drain Hose
REFRIGERANT PIPING CONNECTIONS

Table of Contents

Related product manuals