EasyManua.ls Logo

LG MLP-F8081CL - Page 39

LG MLP-F8081CL
69 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Service Manual 39
3-Way Valve
Procedure
Confirm that both 3-way(liquid side) and 3-way(gas
side) valves are set to the open position.
Remove the valve stem caps and confirm that the
valve stems are in the raised position.
Be sure to use a hexagonal wrench to operate the
valve stems.
Operate the unit for 10 to 15 minutes.
Stop operation and wait for 3 minutes, then con-
nect the charge set to the service port of the 3-way
(gas side) valve.
- Connect the charge hose with the push pin to the
service port.
Air purging of the charge hose.
Open the low-pressure valve on the charge
equipment slightly to purge air from the charge
hose.
Set the 3-way(liquid side) valve to the closed
position.
Operate the air conditioner at the cooling cycle and
stop it when the gauge indicates 1 kg/cm
2
g
Immediately set the 3-way(gas side) valve to the
closed position.
- Do this quickly so that the gauge ends up indicat-
ing 3 to 5kg/cm
2
g.
Disconnect the charge set, and mount the
3-way(liquid side) and 3-way(gas side) valve's stem
nuts and the service port nut.
- Use torque wrench to tighten the service port nut.
- Be sure to check gas leakage.
Lo
CLOSECLOSE
Purge the air
Gas side
Liquid side
Indoor unit
Outdoor unit
Closed
Open
3-Way
valve
3-Way
valve
Pumping down

Related product manuals