40 Floor Standing Type Air Conditioner
3-Way Valve
Procedure
Confirm that both the 3-way (liquid side) valve and
the 3-way(gas side) valve are set to the closed
position.
Connect the charge set and a gas cylinder to the
service port of the 3-way(gas side) valve.
Leave the valve on the gas cylinder closed.
Air purging.
Open the valves on the gas cylinder and the
charge set. Purge the air by loosening the flare nut
on the 3-way(liquid side) valve approximately 45°
for 3 seconds then closing it for 1 minute; repeat 3
times.
After purging the air, use a torque wrench to tight-
en the flare nut on liquid side valve.
Check gas leakage.
Check the flare connections for gas leakage.
Discharge the refrigerant.
Close the valve on the gas cylinder and discharge
the refrigerant until the gauge indicates 3 to
5kg/cm
2
g
Disconnect the charge set and the gas cylinder,
and set the 3-way(liquid side) and 3-way(gas side)
valves to the open position.
Be sure to use a hexagonal wrench to operate the
valve stems.
Mount the valve stem nuts and the service port nut.
Use torque wrench to tighten the service port nut.
Be sure to check gas leakage.
1) Re-air purging
(Re-installation)
CLOSE
OPEN
R22
Gas side
Gas cylinder
Liquid side
Indoor unit
Outdoor unit
Closed
3-Way
valve
Closed
3-Way
valve