7KLVIRUPPXVWEHFRPSOHWHGDQGVXEPLWWHGWR/*DPLQLPXPRIWKUHHZHHNVSULRUWR¿QDOVFKHGXOLQJRIDQ\VWDUWXS
1RWH,IDQ\RIWKHDERYHLWHPVDUHQRWFRPSOHWHDWWLPHRIVWDUWXSEDFNFKDUJHVZLOOEHDVVHVVHGIRUDGGLWLRQDOFRVWV
Contractor Name: ______________________________________ ____________________________________________________
(Authorized Signature)
Address: ____________________________________________
____________________________________________
Phone: _____________________________________________ Date: _______________________________________________
PRE-COMMISSIONING CHECKLIST
Page 2
Initiate a Commissioning Request
'HVFULSWLRQ Check
Verify this checklist and requirements herein have been met. Complete this checklist in its entirety BEFORE initiating a request for
Commissioning.
Send all Pre-commissioning Package Documents to your LG Applied Representative.
Prepare Pre-commissioning Package Documents
Include Check
1. $FRS\RIWKHUHIULJHUDQWSLSLQJV\VWHPVVKRSGUDZLQJVJHQHUDWHGE\/$760XOWL96SLSHGHVLJQVRIWZDUH
2. $FRS\RIWKHSLSHILWWHU¶VSLSHFKDQJHVDQGILHOGQRWHV
3. $YHULILHGFRS\RIWKH³$V%XLOW´/$760XOWL963URMHFWILOHPWYWKDWLQFOXGHVDOOFKDQJHVQRWHGE\WKHSLSHILWWHUVLQ
Number 2. The tree diagram notes should include changes to the line lengths used for each liquid line segment.
4. A copy of a completed and verified Installation Checklist for the outdoor unit(s), indoor units, and Control Devices. Correct any
procedures needing attention before initiating a request for commissioning.
5. A copy of the air balance report showing proper airflow at all indoor units.
6. A completed Pre-commissioning Device Configuration Worksheet.
7. A completed copy of the Pre-commissioning Checklist.
8. If available, a list of IP addresses obtained from the building owners IT department for each ACP, BacNet, LonWorks, AC Smart
devices.