2-10
Copyright © 2022 LG Electronics Inc. All rights reserved.
Only for training and service purposes.
2. HOW TO ASSEMBLE THE TOP HOUSING
2-1. ASSEMBLE OF KEY PCB
Assemble Red points Screw(CTB3+6GFZR) : 5 EA [Closing torque : 5.0 ± 0.5kgf.cm]
2-2. ASSEMBLE OF PASSIVE RADIATOR
Assemble Red points Screw(CTB3+10GFZR) : 8 EA [Closing torque : 6.0 ± 0.5kgf.cm]