Page 14 of 24
Initialisation of the DESKLINE DL1A parallel systems
To obtain parallel operation of a DESKLINE
®
system it is necessary that the system at first activation drives the lifting units DL1
in end stop position bottom. Thus the control box registers the bottom position for each lifting unit.
If an extra actuator apart from the DL1 is connected to the system this actuator must also be initialised. Drive the actuator to
inner posistion and then to outer position.
Besides the system has to be initialised when exchanging the lifting units or the control box.