EasyManua.ls Logo

Linkam Scientific Instruments HFS600E-PB4 - FTIR600 Vertical Stage Setup; Gas Purge Valve and Tubing Connection

Default Icon
48 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
24
FTIR600 Vertical Stage Setup
Gas Purge Valve with
Tubing Connection
The Stage is sent out with Gas Purge Valve with
Tubing (1) disconnected.
To connect the Gas Purge Valve with Tubing, use
one hand to hold the black and blue colour gas
valve (2), then firmly and push the tubing into the
hole as far it can go.
Note: to remove the Gas Purge Valve with Tub-
ing, pull back and hold the blue O-ring (3) and at
the same time pull on the Gas Purge Valve with
Tubing.
1
2
1
Push
Pull

Table of Contents

Related product manuals