Rev: 08.31.23 Page 10 CCD-0007174
A
IV. Using the appropriate-sized drill bit for the OEM-supplied fasteners, drill through the flooring
at the previously marked (step II) six locations.
V. Retrieve the leg and place the pedestal on the floor, aligning the pedestal mounting plate
holes with the drilled holes in the flooring.
VI. Install the OEM-supplied fasteners through the pedestal mounting plate and flooringholes to
secure the collapsible table leg in-place. Tighten mounting hardware wrench-tight.
B. For flathead wood screws:
I. With the pedestal placed on the floor where it will be mounted, use the appropriate-sized drill
bit for the OEM-supplied fasteners.
II. Secure the collapsible table leg in-place with the OEM-supplied fasteners into theflooring.
Fig. 14
Do NOT drill through service lines; hydraulic, electric, fuel, gas. Drilling through service lines can
cause damage to the unit and/or personal injury. Use caution when drilling.
Floor
A. For flathead machine screws with washers and hex nylon lock nuts:
I. Make sure designated drilling area is clear of service lines.
II. Use a pencil to mark the locations of the six mounting holes (Fig. 14A) in the base plate.
III. Set the table leg aside.