EasyManua.ls Logo

Lorentz PS2-100 - Getting Started; Setting Up Your Pump

Lorentz PS2-100
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EnglishEnglish
2
Position the controller out of direct sunshine.
This will reduce the chances of the controller
switching o from overheating.
Note: The pump is not equipped with a non-re-
turn valve which may be required for certain
applications.
Getting started
Setting up your pump
Connect a hose or pipe to the pump outlet.
Fix the controller properly on a wall or the back-
side of a PV module.
Connect the motor cables.
Connect either accessories or jumpers to A1 and
A2. Input A1 has a 15 min delay in the case dry
run is detected.
Connect the solar (PV) cable last.
Position the PV modules facing the sun, avoid
shading.

Related product manuals