EasyManua.ls Logo

LSIS XEC-DN32H/DC - Page 130

LSIS XEC-DN32H/DC
315 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 5 Positioning Instructions
5 - 31
(b) Operation of the Program
• SSS instruction is executed if there is the rising edge of M0001, which was used as the speed
synchronous instruction signal. Since the second operand is 1(axis Y), axis Y becomes the
auxiliary axis, and because the fifth operand is 0(axis X), the main axis is axis X.
• If there is the rising edge of M0002, which is the indirect starting instruction signal of the main axis,
No. 1 step of axis X is indirectly started.
• When the main axis is started, axis Y is started at the synchronous ratio speed of 100.00[%] set in
the third operand of SSS instruction, and is synchronized to the main axis with the delay time of
10[ms] set in the fourth operand for operation.

Table of Contents