EasyManuals Logo

M&R Starlight A50 User Manual

M&R Starlight A50
36 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #25 background imageLoading...
Page #25 background image
M&R Companies 440 Medinah Rd. Roselle, IL 60172 USA 25
Tel: +630-858-6101 Fax: +630-858-6134 www.mrprint.com | store.mrprint.com
V.113017
7. Scheduled Maintenance
Benefits
Properly maintained equipment operates more efficiently, reduces operating costs, and lasts longer. A properly
managed preventive maintenance program can minimize downtime.
Preparation
An effective preventive maintenance program includes:
proper selection, handling, and application of lubricants
stocking high-quality replacement parts
general cleaning and appearance of equipment
creation of a preventive maintenance history for each piece of equipment
Preventive maintenance documentation can be an invaluable resource. This schedule is based on an 8 hour
day and a 40 hour work week.
Daily
WARNING: To prevent possible injury to personnel and/or damage to the equipment, lock
out and tag the electrical service to the equipment.
Inspect and Clean Vacuum Blanket
Inspect the vacuum blanket (1) for indications of photo emulsion residue, or other dirt and contaminants. Use a
towel, moistened in warm tap water to clean away any dirt or residue. Be sure to wipe the vacuum frame blanket
dry.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the M&R Starlight A50 and is the answer not in the manual?

M&R Starlight A50 Specifications

General IconGeneral
BrandM&R
ModelStarlight A50
CategoryPrinter
LanguageEnglish

Related product manuals