EasyManua.ls Logo

Manitowoc I0320 - Control Board Relay Test

Manitowoc I0320
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
126 Part Number STH038 5/12
CONTROL BOARD RELAY TEST
The control board can be set to energize all relays for
3.5 minutes. This allows testing to verify control board
relays are closed and line voltage is available for ice
machine components - Water pump, dump valve,
water inlet valve, harvest valve(s), air compressor,
contactor/compressor/fan motor - The fan cycle
control must close to energize the fan motor.
1. Press power button to turn off ice machine.
2. Perform the following keystrokes on the display.
Press Menu, scroll down to Service and press the
right arrow
Scroll down to Diagnostics, press the right arrow
and select Diagnostics
Display reads Control Board, press right arrow
Scroll down to enbl relays and press right arrow to
start control board test
3. The control board will energize all relays and the
red light next to the relay. The red light indicates
the relay coil is energized.

Table of Contents

Related product manuals