07-03-19 Control # 091-09 3-3
600H SERIES OPERATOR MANUAL CONTROLS AND OPERATING PROCEDURES
National Crane
3
Hoist
Position the control lever to DOWN to lower the loadline and
UP to raise the loadline. Refer to hoist system operation
section for additional information
.
Outriggers
The outrigger control is setup so that two like components
can be operated simultaneously or any one component can
be operated separately. The control lever activates the
outrigger function and a toggle switch selects the
component. If the toggle switches are not used, the front two
or the back two outrigger beams or jacks move
simultaneously when the control lever is activated.
Simultaneous Outrigger Component Operation
Position the appropriate control lever from neutral to the
desired function. Two outrigger components (Front or
Rear) are activated.
FIGURE 3-2
C
r
a
n
e
C
o
n
t
r
o
l
s
O
u
t
r
i
gg
e
r
C
o
nt
r
ol
s
9
6
7
8
5
1
2
3
4
11
10
Item Description
1 Boom
2Hoist
3 Telescope
4Turn
5Horn
6 Rear Outrigger Beam
7 Front Outrigger Jack
8 Rear Outrigger Jack
9 Front Outrigger Beam
10 Outrigger Selector Switch
11 Engine Stop Switch
Item Description
FRONT
DANGER
Payout loadline before extending boom. Failure to do so
will cause the loadline to break or damage the crane.