EasyManua.ls Logo

Manitowoc S300 - Harvest Pressure Solenoid Valve

Manitowoc S300
300 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
168 Part Number 80-1479-3 7/10
HARVEST PRESSURE SOLENOID VALVE
(S3300 Only)
FUNCTION
Transfers refrigerant from the high side to the low side
during the harvest cycle.
CHECK PROCEDURE
1. Reset the ice machine with the toggle switch to
over ride the 6 minute freeze lock.
2. Initiate a premature harvest by grounding the ice
thickness probe.
3. Verify the coil has line voltage supplied in the
harvest cycle and magnetism is present
4. If voltage and magnetism are present Refer to S
Model Quad evaporator operational analysis chart
page 99.

Table of Contents

Related product manuals