EasyManuals Logo
Home>Manitowoc>Ice Maker>UG065A

Manitowoc UG065A Technician's Handbook

Manitowoc UG065A
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #82 background imageLoading...
Page #82 background image
–72–
Self-Contained Recovery/Evacuation
Place the toggle switch in the OFF position.
Install manifold gauges (with low loss fittings), scale,
and recovery unit or two-stage vacuum pump.
Open (backseat) the high and low side on manifold
gauges.
Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as directed by
the manufacturer’s instructions.
B. Evacuation prior to recharging: Pull the system
down to 500 microns. Then, allow the pump to run
for an additional half hour. Turn off the pump and
perform a standing vacuum leak check.
NOTE: Check for leaks using a halide or electronic
leak detector after charging the ice machine.
Follow the Charging Procedures on the next page.

Table of Contents

Other manuals for Manitowoc UG065A

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc UG065A and is the answer not in the manual?

Manitowoc UG065A Specifications

General IconGeneral
BrandManitowoc
ModelUG065A
CategoryIce Maker
LanguageEnglish

Related product manuals