NOTE:
Specified dimensions assume the use of
2x4
framing.
If
you
are
using
2x6
framing, add
12"
to the
-pening height, and after fireplace is installed, finish
.pace with
2x4
framing. Offsets will be required with
2x6
framing to achieve adequate clearance from the
chimney to combustibles.
STEP
2:
Install the provided nailing flanges to
the
fireplace (as
shown in Figure
8A)
and position the fireplace into tlie framing.
Do not secure yet.
STEP
3:
Slide ihe metal safety slrips/shields provided
1-112"
underneath the fireplace opening
as
shown in Figure
8.
The
safety strips/shields should overlap ead~ other by a minimum
of
a
half inch
(112").
NOTE:
If
you areusing a raised platform, a
"2"
type safety shield will
be
required (See Figure
39.)
STEP
4:
Secure
the
fireplace
to
thc framing nt the rrlounting
flanges as sllowrt in Figure
8R.
BLACIC
PORTION
OF
FRAMF
NOT
10
BE
COVtHFn
WITH
COMRUSTIOLE
MATERIALS
-
'7
7-
47"
MIN
-
H"
14
'h"
SQUARE
I
4
112-
L
-
STUD- STUD^
Figure
5
the
use
of
2x3
framing
MIN.
L
.,,..
--A
1
MODEL
841-CF
SHOWN
Figure
4
.
.
3
%r"
MODEL
841-HC
SHOWN
Figure
7