FX20 INSTALL GUIDE
32 VERSION 1.6 | APRIL 26, 2024
CHANGE LOG
1.6
Note: In this guide, "x-axis" means right-to-left, "y-axis" means front-to-back (with respect to
the printer).
Added FX20 Accessory Kit/Bag and Required Partner Tools Checklist (pg. 6-7)
Updated Level the Printer Chassis (pg. 12)
Updated Level the Print Bed (pg. 17)
Updated Set the Encoder Gaps (pg. 19)
Added Device Setup Utility section (pg. 24)
Added Chamber Temperature Calibration Utility section (pg. 26)
Added Gantry Squaring Procedure (pg. 29)
1.5
Like the 1.3 revision, this update substantially reorders several sections of the install procedure and adds an
important additional step (the sign-o sheet on the next page). Please reread the Guide before proceeding
with your next install.
Reorder sections/steps of leveling procedure
Expected install time is now minimum two days on site
Add belt tension check/adjustment before printing
Add installer sign-o sheet including required measurements/photos
Added digital calipers requirement to Additional Equipment list
Minor clarications and rewording throughout
1.4
Add gantry skew alignment before nozzle oset procedure
Material loading and chamber heating are now handled by nozzle oset utility
Add sample Day 1 schedule