EasyManua.ls Logo

Marlec Solar iBoost+ - Installation

Marlec Solar iBoost+
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Two hanging brackets and two lower fixing screw points are provided:
1. Installation
100mm
100mm
100mm 100mm
Minimum clearance is 100mm all around. Do not allow airflow to be obstructed.
Fixing the Solar iBoost+
Positioning
The Solar iBoost+ unit is typically located close to the hot water tank (airing cupboard or
similar) and electrically connected between a fused outlet or MCB and the immersion
heater.
Rear Hanging Brackets
Fixing Screw Points
Use screws supplied or suitable screws for
the mounting surface.

Other manuals for Marlec Solar iBoost+

Related product manuals