EasyManua.ls Logo

MASSEY FERGUSON 6400 - C. Reassembling

MASSEY FERGUSON 6400
208 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Massey Ferguson 6400 - Issue 1
02A02.7
Splitting - Front frame / Sisu engine
C . Reassembling
24. Clean the mating faces of the engine and front
frame.
25. Screw a guide studs onto each rear face of the
front frame (Fig. 12).
26. With the help of an operator, assemble the front
frame onto the engine. Take out the guide studs.
27. Fit and tighten the diametrically opposed screws
(Fig. 10) in the following order:
- Screw (2): 480 -640 Nm,
- Screw (3): 800 -1040 Nm,
- Screw (1): 240 -320 Nm.
Final operations
Remark
Final operations are quite simple, and should therefore
be carried out in the reverse order to preliminary oper-
ations.
However, it will be necessary during reassembly to
carry out the tightening torques, checks and tests
described below.
Tightening torques
- As required, wheel screws or nuts (see chapter 6).
Topping-up
- of coolant, to the maximum level marked on the
expansion tank (Fig. 13).
Testing
- air conditioning mechanism (if fitted – see chapter
12),
- suspended front axle (if fitted – see chapter 8),
- all mechanical, hydraulic, electrical and electronic
functions concerned by servicing.
Checking tightness
- of hydraulic unions,
- of water hoses,
- of bleed screw on control unit of suspended front
axle (if fitted).
Fig. 12
Fig. 13
¤
H

Table of Contents

Related product manuals