EasyManua.ls Logo

MASSEY FERGUSON 6499 - Page 156

MASSEY FERGUSON 6499
208 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Massey Ferguson 6400 - Issue 1
02B02.10
Splitting – Sisu Engine / GBA10 Gearbox
Final operations
Remarks
Final operations are quite simple and should therefore
be carried out in the reverse order to preliminary
operations. However, it will be necessary during
reassembly to carry out the tightening torques,
adjustments and tests described below.
Tightening torque
- Front cab attachment screw, if necessary. See
chapter 12.
Topping-up
- of coolant to the maximum level marked (radiator,
expansion tank. Fig. 13).
Adjustments
- Chassis reinforcements (if fitted, see chapter 2).
Tests
- air conditioning system (if fitted – see chapter 12),
- cab suspension (if fitted, see chapter 12),
- All mechanical, hydraulic, electrical and electronic
functions concerned by servicing.
Checking tightness
- of hydraulic unions,
- of bleed screw on control unit of suspended front
axle (if fitted).
Fig. 13
¤
H

Table of Contents

Related product manuals