EasyManua.ls Logo

MASSEY FERGUSON 6499 - Page 200

MASSEY FERGUSON 6499
208 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Massey Ferguson 6400 - Issue 1
02C02.16
Splitting - GBA10 gearbox / Centre housing
Final operations
Remark
Final operations are quite simple, and should therefore
be carried out in the reverse order to preliminary oper-
ations. However, it will be necessary during reas-
sembly to carry out the tightening torques,
adjustments and tests described below.
Tightening torques
- Rear cab attachment (see chapter 12).
- 4WD cover screw: 85-120 Nm (mating facing previ-
ously smeared with Loctite 510 or equivalent).
- Rear wheels screws or nuts (see chapter 6).
Topping-up
- of transmission oil in the housings (check on trans-
parent tube located to the left of the PTO housing).
Adjustments
- Creeper cables (if fitted).
- Gear cables on the selector cover.
- Chassis reinforcements (if fitted, see chapter 2).
- 540 - 1000 rpm PTO cable.
- 750 rpm PTO cable.
- Auto-hitch control cables (if fitted).
- Auxiliary spool valve cables (depending on version).
Return to operation
- of Park Lock mechanism (optional) (for engagement
position see manual intervention, chapter 9).
- Bleeding of main brakes and trailer brake, depending
on option (see chapter 9).
Tests
- Suspended front axle (if fitted)
- Cab suspension (if fitted, see chapter 12)
- Reverse shuttle
- Gears 1 to 4
- Hare/Tortoise range
- Dynashift
- Creeper unit (if fitted).
- Park Lock mechanism (optional).
-Linkage
- Auxiliary spool valves
- Power take-off (all versions)
- Auto-hitch (if fitted)
Checking tightness
- of mating faces
- of hydraulic unions,
- of control block bleed screw (suspended front axle).
¤
H

Table of Contents

Related product manuals