Massey Ferguson 6400 - Issue 2
02A01.14
Splitting - Front frame / Perkins engine
Dimensions of the screws and nuts
• Front frame and Perkins engine with mechanical
injection
• Front frame and Perkins EEM engine
Reassembly
Advice for use
Use guide studs to assist reassembly of the front
frame and engine.
50. Clean the mating faces of the engine and front
frame.
51. Screw two guide studs (1) to the front mating face
of the engine (Fig. 26).
52. With the help of an operator, assemble the front
frame onto the engine as follows:
• Front frame and Perkins engine with mechan-
ical injection (Fig. 27)
53. Fit screws (2), (4) and nuts (1), simultane-
ously taking out the guide studs.
54. Tighten opposing screws and nuts to a
torque of 240 - 320 Nm in the following order
(2) (4) (1).
• Front frame and Perkins EEM engine (Fig. 28)
Reminder
If it is necessary to chock the front frame, refer
to § D.
55. Fit screws (2), (3) and (4) and nuts (1), simul-
taneously taking out the guide studs.
56. Tighten opposing screws and nuts to a
torque of 240 - 320 Nm in the following order
(2)(3)(4)(1).
Screws Nuts
M16 x 75 mm
M16 x 85 mm
M16x115mm
M16
Screws Nuts
M16 x 85 mm
M16 x 95 mm
M16x105mm
M16x120mm
M16
Fig. 26
Fig. 27
Fig. 28