EasyManua.ls Logo

Matco Tools AC442 - Equipment Installation; Safe Unpacking of the AC442 Unit

Matco Tools AC442
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
en
15 | AC442 | Equipment installation
1901016-85
6
Equipment installation
6.1
Unpacking AC442
Warning – Risk of personal injury!
Incorrect handling could cause equipment
to overturn.
The manufacturer disclaims all responsibility
for damage to objects and/or persons resulting
from the equipment being wrongly removed
from the pallet, or if the operation is performed
by unsuitable personnel, with improper means
protections and without complying with the
existing laws on manual handling of loads and
with the operations described in this manual.
Remove staples and remove the carton (Fig. 10)
Slowly lower the unit from pallet by means of the rear
wheels (Fig. 12).
Fig. 12: Lowering unit from the pallet
Keep the pallet, carton, and scratch protection film for use in
case of a need to return unit.
Fig. 10: Removing carton
Cut straps securing unit to pallet.
With 2 people, lift both front wheels by levering with the
handle so unit is setting on the rear wheels (Fig. 11).
Fig. 11: Tilting unit backwards

Related product manuals