Daily Start-up Checklist
1.
Check Fluid Levels:
a.
Engine Oil
b.
Engine Coolant
c.
Hydraulic Oil
d.
Wash Down fluid
2.
With the key switch in the “ON” position:
a.
Check Engine Fuel Level
b.
Turn on wash down pump and verify operation, turn off when complete.
c.
Verify proper operation of engine gauges or indicator lights.
3.
Turn Key switch back to “OFF” position.
4.
Remove asphalt from all mechanical moving surfaces
5.
Remove asphalt from all screed burner heating areas
6.
Check Propane Tank level.
Perform All Propane Testing In A Well Ventilated Area Only!
FAILURE TO COMPLY MAY RESULT IN DAMAGE TO EQUIPMENT
AND / OR INJURY OR DEATH TO PERSONNEL.
7.
Verify that ALL propane valves are in the closed position.
8.
Pressurize the propane system by opening the master valve located on the propane tank.
9.
With system pressurized, listen for leaks. Run hand over all propane fittings to feel for
leaks. If any leaks are detected, DO NOT OPERATE UNTIL THEY ARE REPAIRED!
10.
Check pressure regulator is set to 4 – 6 PSI on screed.
a.
If regulated pressure is too high, open main screed valve only allowing gas to
escape.
b.
Adjust regulator to 4 – 6 PSI on screed.
c.
Close main screed valve.
11.
Close the master valve located on the propane tank.
12.
Verify & if necessary follow procedure to set screed.
13.
Perform a machine walk around looking for:
a.
Any signs of physical damage
b.
Any signs of a leak, (fuel, engine oil, hydraulic oil, engine coolant)
c.
Welded steel junctions
d.
Hydraulic cylinder pins all secure