EasyManua.ls Logo

Max NF665/15 - Operation and Testing; Nail Loading Procedure; Test Operation and Air Hose Connection

Max NF665/15
13 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9
NAIL LOADING
1 Insert the finish nails into the magazine.
2 Pull back the pusher.
3 Release and return the pusher.
TEST OPERATION
1 Adjust the air pressure at 70 p.s.i. (5 bar) and connect the
air supply.
2 Without touching the trigger, depress the contact arm
against the work-piece.
Pull the trigger (The tool must fire the fastener.)
3 With the tool off the work-piece, pull the trigger.
Then depress the connect arm against the work-piece. (The
tool must fire the fastener.)
4 Adjust the air pressure as much as the lowest possible ac-
cording the length of fastener and the hardness of work
piece.
AIR HOSE CONNECTION
Connect the air chuck to the air plug.
When connecting the air chuck, do not point the nail dis-
charge outlet at any part of your body or at another person,
and do not touch the trigger.
Pusher
Finish nails
WARNING

Related product manuals