EasyManua.ls Logo

MBM 93M - Installation

MBM 93M
20 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
3
Connect the power cord to a single
phase socket .
120V/4A
Insert the 1st fold plate(long plate)
into the studs (A) and (B) and lock into
position.
When the 2nd fold plate(short plate)
put inPlease see clearly the labels at
both ends as shown.
Put the label indicator: Zigzag fold,
Letter fold, and Double fold into the
machine. With three folding methods:
Letter fold, Zigzag fold, Double fold.
Authorized
Dealer Canada

Related product manuals