Equipment Start-up
Initial start-up of any Incremental
®
conditioner by an
experienced technician is usually the responsibility of
the installing contractor. This consists of inspecting and
operating the equipment for all functions at the time of
initial installation and making necessary adjustments.
It also includes demonstrating its proper operation to
the owner or their agent.
Note: that unless otherwise specically agreed to in
writing, McQuay includes no eld labor, start-up ser-
vice, or the like, in the price of the equipment. After the
equipment leaves the McQuay factory, it may become
damaged or maladjusted during transportation or on
the job. Sometimes wires are disconnected accidentally
or fan motors move on their bases due to rough han-
dling, causing the fans to strike. The correction of such
conditions is part of the start-up.
Before starting equipment, make
certain that:
1. The correct voltage has been supplied to the equipment.
2. The electrical plug from the control box has been
inserted into the receptacle.
Note: The direction of the conditioned air may be ad-
justed by rotation of the discharge grilles to change the
airow pattern in a room. The building superintendent
or assistant manager should be requested to make any
changes as a thin at-edged tool is required to remove
the grille.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the McQuay PDAE and is the answer not in the manual?

McQuay PDAE Specifications

General IconGeneral
BrandMcQuay
ModelPDAE
CategoryAir Conditioner
LanguageEnglish

Related product manuals