DC5xD MK3 GENSET CONTROLLER USER MANUAL
19
9. Control and operation instruction
Manual test mode: (only DC52D MK3 has this function)
Press and make sure it is in the stop position before starting.
Press and the test file indicator is on. At this time, it is detected whether the
connection of each sensor is normal. If the sensor is open, the sensor opens an
alarm. If it is normal, the unit start process is executed in the following sequence after
pressing the " ". automatically switch to Generator provide the power when the
unit is running normally. Press The controller performs the parking process at
the following timing:
0RPM
Idle
Rated speed
Pre-
heat
delay
5S
Long-
est
pre-oil
supply
delay
0S
Start
Crank
delay
2S
8S
Safe
time
8S
Start
idle
time
5S
Longest
speed
increasing
time
120S
Idle
Rated speed
Pre-
heat
delay
Longest
temperature
increasing
time
10S
Longest
voltage
built/
increasing
time
120S 10S
rated
runn-
ing
Cooling
running time
30S
Stop
idle
time
5S
ETS
solen-
oid
hold
10S
Wait
Stop
30S
warming
up time
Crank
test
time
Manual Start Mode
press and make sure it is in the stop position before starting.
Press and the test file indicator is on. At this time, it is detected whether the
connection of each sensor is normal. If the sensor is open, the sensor opens an
alarm. If it is normal, the unit start process is executed in the following sequence after
pressing the " ". automatically switch to Generator provide the power when the
unit is running normally. Press The controller performs the parking process at
the following timing:
Manual start and stop process:
0RPM
Idle
Rated speed
Pre-
heat
delay
5S
Long-
est
pre-oil
supply
delay
0S
Start
Crank
delay
2S
8S
Safe
time
8S
Start
idle
time
5S
Longest
speed
increasing
time
120S
Idle
Rated speed
Pre-
heat
delay
Longest
temperature
increasing
time
10S
Longest
voltage
built/
increasing
time
120S 10S
rated
runn-
ing
Cooling
running time
30S
Stop
idle
time
5S
ETS
solen-
oid
hold
10S
Wait
Stop
30S
warming
up time
Crank
test
time
After the manual start is successful, pressing the "automatic key" can be
converted into an automatic file. The specific working time is as follows:

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mebay DC5 D MK3 Series and is the answer not in the manual?

Mebay DC5 D MK3 Series Specifications

General IconGeneral
BrandMebay
ModelDC5 D MK3 Series
CategoryController
LanguageEnglish

Related product manuals