EasyManua.ls Logo

Medivators DSD EDGE - Procedure; Preparing the SSG Unit

Medivators DSD EDGE
46 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
A
NNUAL PM INSTRUCTIONS
PREVENTATIVE MAINTENANCE KIT
PROCEDURE
CAUTION: PPE must be worn before proceeding. Refer to the MSDS for guidance.
Preparing the SSG Unit:
Both sides of the machine must be in an idle state.
The floating lids must be installed in both sides and the lids closed.
Fill the container 3/4 full of water. Add ten grams (2 teaspoons) of table salt for every 5 liters of water. If using the
empty bottles, add ten grams (2 teaspoons) of table salt to each filled bottle.
Remove the uptake tubes from both the part A and B bottles. Remove the bottles from the drawer.
Set the container of water in the drawer and set both uptake tubes in the container. See figure 1
Figure 1

Other manuals for Medivators DSD EDGE

Related product manuals