Process of installation:
Step 1. Use the CAN cable to connect inverter and lithium battery .
Step 2. Press the button to start lithium battery , power output ready . Replace the battery BMS
protocol to “DEYE” by BMS tool and host computer.(Please refer to page 4,point 4.2)
Step 3. Turn on the inverter (Warning: Turn on the battery first and then the inverter).
Step 4. Be sure to select inverter work model type as “Lithium Model: 00 on the inverter screen. As
below picture.
If communication between the inverter and battery is successful, the inverter screen will show the
battery system real-time status.
PS: