EasyManuals Logo

Megger B10E User Manual

Megger B10E
16 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #6 background imageLoading...
Page #6 background image
1
General
1.1 Introduction
Power Supply Unit B10E is used to supply voltage to
the Circuit Breaker (CB) coils and spring-charging mo-
tor during installation and/or field service.
Since the high-quality voltage available at the coil
outputs is very load-independent, the power supplied
resembles what is encountered under normal oper-
ating conditions. Circuit breaker functionality thus
remains virtually unchanged.
B10E enables you to test CB functions easily at the
specified voltage levels.
1.2 Service and support
For technical assistance please contact your local
Megger representative or direct your request to the
office in Sweden.
Contact Information
Internet: www.megger.com
E-mail: support-sweden@megger.com
Tel: +46 8 510 195 00
Checklist before calling/e-mailing
for support
Read the manual
Restart the instrument(-s), redo test connections and try
again
Try to repeat the failing operation if possible
Identify the instrument model and serial number.
Shipping
If you are going to send the instrument with parcel
service use the original transport box or one with
equivalent strength. Megger can not take responsibil-
ity for transport damages.
6 B10E ZP-BG02E BG0140ME
1 GENERAL

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Megger B10E and is the answer not in the manual?

Megger B10E Specifications

General IconGeneral
BrandMegger
ModelB10E
CategoryPower Supply
LanguageEnglish