EasyManua.ls Logo

Mellanox Technologies SN2100 - Package Contents; Pay Attention

Mellanox Technologies SN2100
8 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2
Pay Attention!
All servers and systems in the rack should be planned with the airflow
direction. All FRU components must have the same air flow direction. A
mismatch in the air flow will affect the heat dissipation.
Package Contents
•1 x System
2 x Power cables – Type C13-C14
1 x Harness RS232 2M cable – DB9 to RJ-45
•Quick Start Guide
The following items are not included in the package, and can be pur-
chased separately:
Rack installation kit for SN2100 series short depth 1U switches, allows
installation of one or two switches side-by-side into standard depth
racks (23.6"-31.5" / 600-800mm)
6 x Cable ties
2 x Cable retainers
If anything is damaged or missing, contact your Mellanox representa-
tive at support@mellanox.com.

Other manuals for Mellanox Technologies SN2100

Related product manuals